PERITAS CONSULTING PTY LTD
Melbourne VIC & Perth WA
Contract
Senior Structural Engineer
Deliver structural design, analysis and verification for large-span industrial warehouse, portal frame and mining infrastructure projects across Victoria and Western Australia. Responsible for structural packages including analysis, detailed documentation, RPEV sign-off, site QA and construction-phase engineering support.
- Led structural design and RPEV sign-off across portal frame warehouse developments and a mining-class heavy industrial slab facility in the Pilbara.
- Contributed to performance-based design of a basement plus 8–9 storey RC student accommodation tower at Crawley WA, including raft foundation, core shear walls, suspended slabs and structural optimisation.
- Conducted staged structural site inspections, reinforcement verification, footing and slab compliance checks, and pour-approval sign-off at the Mapei Industrial Facility Truganina under AS 3600.
- Coordinated structural documentation across architectural, mechanical and civil disciplines; resolved design conflicts and maintained structural integrity through construction stage.
- Mentored and coordinated drafting team members on documentation standards, structural detailing and QA review.
Selected projects
- Hope Downs 2 — NPI Maintenance Workshop, Pilbara WA — Heavy-duty mining maintenance facility for large mobile equipment; RC slab and foundation design for high axle/wheel loads, local slab thickening, reinforcement detailing and heavy-load verification.
- Fairway Student Accommodation — Crawley WA — Basement plus 8–9 storey RC structure; raft foundation, core shear walls, suspended slabs, roof steel and performance-based optimisation contribution.
- Metroll Distribution Facility — Butler WA — Long-span portal frame warehouse with precast wall panels, crane-supporting framing, slab-on-ground, portal frame verification and footing documentation.
- Metroll Distribution Facility — Truganina VIC — Large-span industrial distribution warehouse; portal frame behaviour review, column base load transfer and slab/foundation coordination.
- Metroll Warehouse — Ballarat VIC — Portal frame warehouse with RC slab-on-ground and strip/pad footings.
- Cranbourne West Industrial Estate — VIC — Multi-building warehouse development exceeding 30,000 m²; schematic portal frame layouts, preliminary steel sizing, footing planning and loading dock coordination.
- Mapei Industrial Facility — Truganina VIC — Multi-zone industrial production facility; staged site inspections, reinforcement verification and pour-approval support under AS 3600.